Explore our completed projects to see Oremus in action. From large commercial developments to residential foundations, we provide solutions tailored to every need.
FILTER
Location
Project Posts
Type
FILTER
Location
Project Posts
Type
Level Student Housing Tower, University of Arizona
Builder: UEB Builder, Scottsdale, AZ Architect: Architect: CA ventures, Chicago
123 Anystreet, Tucson, Arizona
12,000 sq. ft
The Reed at Southbank, Chicago, IL
As the first high-rise in Chicago to incorporate low carbon concrete, The Reed at Southbank set a bold new standard in sustainable construction—and Oremus Material was proud to be part of the team that made it happen.
Our specially formulated low carbon concrete mix delivered a carbon reduction of over 3.2 million kg CO₂ compared to NRMCA benchmarks, and 1.1 million kg CO₂ below the Owner’s own sustainability targets. Despite the complex requirements of this high-rise application, our mix maintained excellent workability, achieved target set times, and exceeded compressive strength requirements.
With a 26–28″ spread at the point of discharge, the concrete remained highly workable and pumpable—reaching up to 41 stories with no issues. Crews were able to access and finish the surface within 2 hours and were completely off the pour just 4 hours later. Strength performance exceeded expectations, hitting 3,000 PSI in just 18 hours, and delivering consistent results at 6K, 8K, and 10K strength levels—all while maintaining an aggressive low-carbon profile.
Low carbon. High performance. Game-changing results.
Builder: Lendlease, McHugh
Architect: Perkins + Will
Concrete Supplied by: Oremus Material
Application: High-rise residential tower
Yards Placed: 29,200 cubic yards of low-carbon concrete
- Builder: Lendlease, McHugh
- 234 W Polk Street, Chicago, IL 60607
- 29,200 cubic yards of low-carbon concrete
Level Student Housing Tower, University of Arizona
Oremus Material supplied 12,632 cubic yards of concrete for this prestigious project, which broke ground in May 2012 and opened before the start of the 2013-14 school year. The job required us to deliver 11,000-PSI concrete in the heat of summer, when temperatures typically reach 100 degrees or more, all while keeping mix temperatures within specifications. Problem solved: just add ice (and lots of it!) while using chilled water on the spray bars.
- Builder: ADU Builder, Scottsdale, BZ Architect: Architect: WA ventures, Tucson
- 123 Anystreet, Tucson, Arizona
- 12,000 sq. ft.